solarpvinverter.comPV inverters, 1-500 kW

Grid-tied · 5–25 kW

Three-phase on-grid solar inverter, 5–25 kW

Balanced three-phase feed-in for larger homes, shops and small industry: 5–25 kW, dual MPPT, 98.2 % peak.

Three-phase inverters matter wherever the supply is 400 V: Europe, the Gulf, most of Asia and any industrial site. Feeding all three phases evenly avoids the imbalance penalty that some utilities charge and lets a single machine serve loads that a single-phase unit cannot start.

From 5 kW to 25 kW the architecture is the same: two or three MPPTs, a wide 200–1000 V DC window, and an AC stage that stays at 98 %+ across the load range rather than only at one sweet spot. That flat efficiency curve matters more than the peak number, because a shop's load is rarely at 100 %.

Models and ex-works prices

ModelRated ACMPPT / stringsEx-works
PVS-5K-T5 kW2 / 2US$ 396
PVS-8K-T8 kW2 / 2US$ 452
PVS-10K-T10 kW2 / 2US$ 498
PVS-12K-T12 kW2 / 2US$ 548
PVS-15K-T15 kW2 / 3US$ 638
PVS-20K-T20 kW2 / 4US$ 748
PVS-25K-T25 kW3 / 6US$ 862

Prices are ex-works, indicative and exclude freight, duty and installation. Model numbers shown are our standard range; OEM labelling is available from 100 units.

What makes this range different

Wide 200–1000 V MPPT window

Long strings of 20–22 modules without a combiner, or short strings in a 3-string design — the same chassis covers both.

98.2 % peak, 97.8 % weighted

The weighted figure is what the kWh meter sees over a year; we publish both.

Type II DC and AC SPD inside

Surge protection is built in, not an optional box, which matters on overhead-line networks with frequent lightning.

Parallel up to 6 units

Six 25 kW machines can be paralleled for 150 kW of capacity with one monitoring view, without buying a central inverter.

Typical projects

  • Villas and farms with 400 V supply
  • Shops, workshops and cold rooms 10-25 kW
  • Schools and clinics with three-phase distribution

Frequently asked questions

What is the price of a 10 kW three-phase inverter?

About US$ 498 ex-works for our PVS-10K-T. Three-phase machines cost roughly 15–20 % more than an equivalent single-phase unit because of the extra AC stage.

Can a three-phase inverter run on a single-phase supply?

No. The machine expects 400 V three-phase and will fault on missing phases. If the site has only single-phase power, use single-phase inverters, or a hybrid unit with a managed phase-balance output.

Do I need a type A or type B RCD?

Type A is sufficient for transformerless inverters unless the local code or utility specifies type B; our units include integrated DC residual-current monitoring to IEC 62109-2.

Not sure which model fits? Send the array size, the site's temperature range and the grid code — we size it and quote in one working day.

Ready to specify?

Send the load profile and the site — we return a sized quotation with drawings in one working day.