Storage · 5–30 kW
High-voltage hybrid inverter, 5–30 kW
Three-phase storage for commercial roofs: 160–800 V battery, 30 kW output, 100 % unbalanced load capability.
High-voltage batteries changed commercial storage economics: at 400 V nominal, a 20 kWh pack needs one-fifth the current of a 48 V bank, so cables, breakers and losses all shrink. The inverter that pairs with it is a different machine from a 48 V hybrid — and the two are not interchangeable.
Our HV range runs 5–30 kW three-phase with a 160–800 V battery window, which covers the stack sizes from 5 kWh to 100 kWh. It handles 100 % unbalanced load on one phase, so a workshop with a big single-phase welder does not trip the machine, and it parallel-couples for larger sites.
Models and ex-works prices
| Model | Rated AC | Battery / MPPT | Ex-works |
|---|---|---|---|
| PVH-5K-HV | 5 kW | 160–600 V / 2 | US$ 806 |
| PVH-8K-HV | 8 kW | 160–600 V / 2 | US$ 968 |
| PVH-10K-HV | 10 kW | 160–800 V / 2 | US$ 1120 |
| PVH-12K-HV | 12 kW | 160–800 V / 3 | US$ 1280 |
| PVH-15K-HV | 15 kW | 160–800 V / 3 | US$ 1495 |
| PVH-20K-HV | 20 kW | 160–800 V / 4 | US$ 1780 |
| PVH-30K-HV | 30 kW | 160–800 V / 4 | US$ 2360 |
Prices are ex-works, indicative and exclude freight, duty and installation. Model numbers shown are our standard range; OEM labelling is available from 100 units.
What makes this range different
160–800 V battery window
Covers most commercial rack batteries and stackable residential HV packs; commissioning is a voltage check, not a firmware negotiation.
100 % unbalanced output
Full rated power on a single phase for inductive loads — welders, compressors, pumps — without derating the other two phases.
Peak shaving and time-of-use
Set a site demand limit and the inverter discharges the battery above it; the same screen sets cheap-hours charging.
Three-phase backup
Whole-site backup with a transfer time under 20 ms and a neutral-forming output for unbalanced loads.
Typical projects
- Commercial rooftops with 20-100 kWh HV batteries
- Peak shaving and demand-charge management
- Three-phase whole-site backup
Frequently asked questions
HV or LV battery — which should I choose?
Below about 10 kWh and 6 kW, 48 V is cheaper and easier to service. Above that, HV wins on cable size, efficiency and parallel scalability. Commercial projects above 20 kWh are almost always HV.
Can I mix battery brands on a high-voltage hybrid?
No. The inverter must speak the battery's BMS protocol, and HV packs are series-stacked, so one brand and one model per stack. Choose the battery first, then confirm the inverter's protocol list.
Is a high-voltage hybrid inverter safe to install?
Yes, with the same DC precautions as a string inverter: 800 V DC is lethal if mishandled, so the battery must have an integral breaker and the installer must be qualified for DC work above 120 V.
Not sure which model fits? Send the array size, the site's temperature range and the grid code — we size it and quote in one working day.